Our Ventura Kitchen Remodel Process

13 steps from consult to handed-over kitchen. Coastal expertise when you need it.

1

Free On-Site Consultation

60–90 minutes

We come to your Ventura home, measure, listen, talk layout and finishes. For coastal-zone properties, we flag which materials need marine-grade upgrades. No sales pitch.

2

Design & Written Fixed-Price Bid

1–2 weeks

Cabinet spec, counter material, appliance list, electrical/plumbing scope, coastal upgrade list if applicable. Full fixed-price bid.

3

Contract & Deposit

Same week

Sign contract, 10% deposit, scheduled demo date, milestone calendar.

4

Permits & Materials

4–6 weeks (longer if Coastal Zone)

City of Ventura plan submission. Coastal Commission CDP coordination if exterior changes. Long-lead materials ordered — cabinets, counters, appliances.

5

Demolition

1 week

Dust-seal, protect floors/walls, remove old kitchen, haul debris. For coastal homes, we stage materials inside to limit salt exposure during the build.

6

Rough-In Trades

1–2 weeks

Plumbing, electrical, HVAC, vent hood ducting. All trades coordinated by our in-house lead. Inspections scheduled as work completes.

7

Drywall, Paint, Flooring

1 week

Drywall, prime, paint, flooring install. Coastal homes get extra-sealed underlayment to block salt-air humidity migration.

8

Cabinet Install

4–7 days

Cabinets arrive and go in. For coastal projects, cabinet boxes are fully sealed on interior seams before install — this is the step most contractors skip.

9

Countertops

2–3 weeks (template + fab + install)

Template day, 10–14 days fabrication, install day. Ventura Keys and Pierpont projects sometimes get quartz instead of marble due to faster humidity acclimation.

10

Backsplash, Appliances, Finishes

1 week

Tile backsplash, appliance install, plumbing fixtures, final electrical. For coastal homes, every fixture swap uses 316-grade stainless.

11

Final Inspections

3–5 days

City of Ventura plumbing, electrical, mechanical, and final inspections. Coastal Commission final sign-off if project is CDP-required.

12

Punch List & Walkthrough

2–3 days

You walk the kitchen, flag anything needing touch-up. We resolve every item before final payment.

13

Handover & Warranty

1 day

Warranty docs, manuals, maintenance instructions. We explain which finishes need extra care in coastal air. You own the kitchen.